Career (Nazi Germany) | |
---|---|
Name: | Z25 |
Ordered: | 23 April 1938 |
Builder: | DeSchiMAG, Bremen |
Yard number: | W959 |
Laid down: | 15 February 1939 |
Launched: | 16 March 1940 |
Completed: | 30 November 1940 |
Captured: | 6 May 1945 |
General characteristics | |
Class and type: | Type 1936A-class destroyer |
Displacement: | 2,543 long tons (2,584 t) (standard) |
Length: | 127 m (416 ft 8 in) o/a |
Beam: | 12 m (39 ft 4 in) |
Draft: | 4.43 m (14 ft 6 in) |
Installed power: | 70,000 shp (52,000 kW) |
Propulsion: | 2 × shafts 2 × Wagner geared steam turbine sets 6 × Wagner water-tube boilers |
Speed: | 36 knots (67 km/h; 41 mph) |
Range: | 2,174 nmi (4,026 km; 2,502 mi) at 19 knots (35 km/h; 22 mph) |
Complement: | 336 |
Armament: | 4 × 1 - 150 mm (5.9 in) guns 2 × 2 - 37 mm (1.5 in) anti-aircraft (AA) guns 5 × 1 - 20 mm (0.8 in) AA guns 2 × 4 - 533 mm (21 in) torpedo tubes 60 mines |
Service record | |
Commanders: | Carl-Heinz Birnbacher |
Z25 was a Type 1936A-class destroyer built for the Kriegsmarine during World War II.
|